Design
of auxiliary buildings |
|
Stanchion/beam
design from reinforced concrete sections,
gable roof of prefabricated battens,
hipped roof; non-bearing exterior walls
and roof covering in sandwich elements
consisting of two layers of profiled
aluminium sheet with polyurethane insulating
material, D = 6.0 cm |
|
Project
data |
|
Floor
space :
Construction costs: 2.40 Mio Period:
1997 / 1198 |
Cubical
content :
Work phases HOAI: 1 - 9
Construction time: 3 / 97 - 12 / 97
|
|
Builder-owner |
|
Wasser
Nord GmbH & Co KG,
Gewerbepark 5-7, 16540 Hohen Neuendorf
|